Front Load and Roll-Off Containers
Agency: | DEPT OF DEFENSE |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159047563694443 |
Posted Date: | Aug 7, 2023 |
Due Date: | Aug 17, 2023 |
Solicitation No: | W9124P-ACCRSA |
Source: | https://sam.gov/opp/e34a9595ec... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Solicitation (Original)
- All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
- Original Published Date: Aug 06, 2023 09:32 pm EDT
- Original Date Offers Due: Aug 17, 2023 04:00 pm EDT
- Inactive Policy: Manual
- Original Inactive Date: Aug 18, 2023
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: 4540 - WASTE DISPOSAL EQUIPMENT
-
NAICS Code:
- 332439 - Other Metal Container Manufacturing
-
Place of Performance:
Redstone Arsenal , AL 35898USA
The U.S. Army Garrison – Redstone (USAG-R) Directorate of Public Works has a requirement
for steel constructed Front Load and Roll-Off Containers. The requirement includes 350 each of
8 cubic yard (CY) Flat Top, Front Load containers with a minimum of 10 gauge floor and 12
gauge walls, sliding doors, and plastic lids; 25 each of 20 CY Bathtub style Roll-off containers
with a minimum of 7 gauge floor and 10 gauge walls, rear gate with heavy duty hinges; 6 each of
30 CY Bathtub style Roll-off containers with a minimum of 7 gauge floor and 10 gauge walls,
rear gate with heavy duty hinges; 14 each of 40 CY Bathtub style Roll-off containers with a
minimum of 7 gauge floor and 10 gauge walls, rear gate with heavy duty hinges. All containers
will be primed and painted a standard brown color. Exact color to be approved prior to ordering.
Proposals from all vendors offering the required Wastequip brand or equal products will be
considered on a lowest price technically acceptable basis.
Please submit product specifications in sufficient detail for comparison to the minimum
qualifications. Failure to provide adequate detail may result in submission being deemed
unacceptable. Product brochures, pictures, and specification sheets may also be submitted.
Technical documentation may not exceed 10 pages.
The delivery of these dumpsters on schedule is imperative to the transition of the follow-on
refuse services contract. The government is want delivery of the all the requested dumpsters,
between 1 and 30 September 2023.
All deliveries need to be at Redstone Arsenal, AL not later than 06 October 2023 is required.
Inaccordace with 15.101-2, Lowest price technically acceptable source selection process will be
used.
Send all questions to Cledis Henry, by COB 10 August 2023.
Send all intial proposal and pricing by COB 17 August 2023.
Please submit your proposal pricing breakdown in a speadsheet format.
Provide an date(s) of delivery between 1 and 30 September 2023.
Point of Contact Information for proposal:
Cledis Henry, cledi.henry.civ@army.mil Contract Specialist, CCAM-CAD-A.
Cleveland Crutcher, cleveland.crutcher.civ@army.mil Contarcting Officer, CCAM-CAD-A.
- BASE OPERATIONS DIVISION BLDG 5201 MARTIN RD RM 200A
- REDSTONE ARSENAL , AL 35898-5200
- USA
- Cledis Henry
- cledis.henry.civ@army.mil
- Phone Number 7033712493
- Cleveland Crutcher
- cleveland.crutcher.civ@mail.mil
- Phone Number 2569554919
- Aug 06, 2023 09:32 pm EDTSolicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.